Cameroon
Engineering, Rehabilitation and Extension of Cameroonian Water Supply Systems (Phase 3 - T3)
(2013-11-01 - 2014-06-30)
The project aims to engineer and rehabilitate water supply systems within the whole country. The contract is divided into 5 phases
Limbe
Rehabilitation works including:
- - Audit of the water distribution network of the city.
- - Design of an HDPE pipe OD 250 – SDR 11, 4.6km.
- - Rehabilitation engineering of the ‘Mile II’ water treatment plant (120 m³/h).
- - Rehabilitation engineering and extension of the ‘Mile IV’ water treatment plant (120 m³/h to 240 m³/h).