Cameroon

Engineering, Rehabilitation and Extension of Cameroonian Water Supply Systems (Phase 5 - T5)

(2016-03-01 - 2017-11-30)

The project aims to engineer and rehabilitate water supply systems within the whole country. The contract is divided into 5 phases

 

Akonolinga

Rehabilitation works including:

  •  - Rehabilitation engineering of the intake and the raw water pumping station
  •  - Rehabilitation engineering of the treatment plant (88 m³/h)
  •  - Rehabilitation engineering of the treated water pumping station and reinstallation of the hydro-mechanical equipment on the treated water main towards the elevated tank
  •  - Rehabilitation engineering of the elevated tank
  •  - Engineering of the electrical line MV/LV

 

Ambam

Rehabilitation works including:

  •  - Rehabilitation engineering of the intake and the raw water pumping station
  •  - Rehabilitation engineering of the treatment plant (22 m³/h)
  •  - Rehabilitation engineering of the treated water pumping station and reinstallation of the hydro-mechanical equipment on the treated water main towards the elevated tank
  •  - Rehabilitation engineering of the elevated tank.

 

Batouri

Rehabilitation works including:

  •  - Rehabilitation engineering of the intake and the raw water pumping station
  •  - Rehabilitation engineering of the treatment plant and extension of its capacity (110 m³/h)
  •  - Rehabilitation engineering of the treated water pumping station and reinstallation of the hydro-mechanical equipment on the treated water main towards the elevated tank
  •  - Rehabilitation engineering of the elevated tank

 

Campo

Rehabilitation works including:

  •  - Rehabilitation engineering of the intake and the raw water pumping station
  •  - Engineering of a new and more efficient containerized unit (20 m³/h)
  •  - Engineering of a technical building
  •  - Rehabilitation engineering of the treated water pumping station
  •  - Rehabilitation engineering of the elevated tank
  •  - Reinforcement design of the electrical line MV/LV

 

Evodoula

Rehabilitation works including:

  •  - Rehabilitation engineering of the intake and the raw water pumping station
  •  - Rehabilitation engineering of the treatment plant and extension of its capacity (25 m³/h)
  •  - Rehabilitation engineering of the treated water pumping station and reinstallation of the hydro-mechanical equipment on the treated water main towards the elevated tank
  •  - Rehabilitation engineering of the elevated tank
  •  - Engineering of the electrical line MV/LV

 

Monatélé

Rehabilitation works including:

  •  - Rehabilitation engineering of the intake and the raw water pumping station
  •  - Rehabilitation engineering of the treatment plant (30 m³/h)
  •  - Rehabilitation engineering of the treated water pumping station and reinstallation of the hydro-mechanical equipment on the treated water main towards the elevated tank
  •  - Rehabilitation engineering of the elevated tank
  •  - Reinforcement of the electrical line MV/LV to the treatment plant

 

Okola

Rehabilitation works including:

  •  - Rehabilitation engineering of the intake and the raw water pumping station
  •  - Rehabilitation engineering of the treatment plant and extension of its capacity (25 m³/h)
  •  - Rehabilitation engineering of the treated water pumping station and reinstallation of the hydro-mechanical equipment on the treated water main towards the elevated tank
  •  - Rehabilitation engineering of the elevated tank
  •  - Engineering of the electrical line MV/LV

 

Sa’a

Rehabilitation works including:

  •  - Rehabilitation engineering of the intake and the raw water pumping station
  •  - Rehabilitation engineering of the treatment plant (22 m³/h)
  •  - Rehabilitation engineering of the treated water pump and reinstallation of the hydro-mechanical equipment’s on the treated water main towards the water storage reservoir
  •  - Engineering of a new cylindroconical decanter (22m³)
  •  - Rehabilitation engineering of the reservoir
  •  - Engineering of the electrical line MV/LV to the treatment plant

 

Yokadouma

Rehabilitation works including:

  •  - Rehabilitation engineering of the intake and the raw water pumping station
  •  - Rehabilitation engineering of the treatment plant and extension of its capacity (80 m³/h)
  •  - Rehabilitation engineering of the treated water pump and reinstallation of the hydro-mechanical equipment’s on the treated water main towards the water storage reservoir
  •  - Rehabilitation engineering of the reservoir
  •  - Engineering of the electrical line MV/LV

 

Zoétélé

Rehabilitation works including:

  •  - Rehabilitation engineering of the intake and the raw water pumping station
  •  - Rehabilitation engineering of the treatment plant (25 m³/h)
  •  - Rehabilitation engineering of the treated water pumping station and the treated water main towards the elevated tank
  •  - Rehabilitation engineering of the elevated tank
  •  - Engineering of the electrical line MV/LV