Kenya

Sabor - Iten - Tambach Water Supply Project (Phase One)

(2014-11-03 - 2016-11-30)

New system including:

  •  - Engineering of a weir on the Charama river
  •  - Engineering of a 4,280 m³/d drinking water treatment plant (24h/day production - gravity system enabling it operate near-autonomously, without any electrical energy contribution)
  •  - Design of a 22,300m of treated water main - HDPE OD 400
  •  - Engineering of a 1,250 m³ circular storage tank – reinforced concrete.