Kenya
Mavoko Drinking Water Supply Project
(2017-02-01 - 2020-08-31)
KMC Dam:
- - Design of 2 + 1 pumps of 115 m³/h at 115 m, electrical panels, piping and valves
- - Engineering of the pump room
- - Design of a 6.2 km HDPE OD 355 raw water main from the intake towards the new water treatment plant
- - Design of a step-down transformer (11/0.40 kV, 315 kVA)
- - Rehabilitation engineering and cleaning of the existing dam.
EAPCC Dam:
- - Design of 1 + 1 pumps of 115 m³/h at 115 m, electrical panels, piping and valves
- - Rehabilitation engineering of the pump room;
- - Design of a 3.6 km of HDPE OD 250 raw water main for the raw water backup towards the new water treatment plant
- - Design of a new step-down transformer (11/0.40 kV, 200 kVA)
- - Rehabilitation engineering and cleaning of the existing dam.
- - Design of a step-down transformer (11/0.40 kV, 315 kVA).
New water treatment plant:
- - Engineering of a 12,000 m³/day drinking water treatment plant.
- - Engineering of a 5,000 m³ reinforced concrete ground reservoir incl. procurement and installation of valves and ancillary equipment.
Nairobi - Syokimau pipeline:
- - Design of a 10,6 km HDPE OD 400 from Nairobi to Syokimau to improve the drinking water supply coming from the capital;
- - Engineering of a 4,000 m³ storage reservoir downstream this new pipeline;
- - Engineering of a 300 m³ steel elevated tank to enable the supply of drinking water in the elevated zone of Syokimau;
- - Design of 1 + 1 pumps (200 m³/h at 25 m), electrical panels, piping, and valves;
- - Engineering a small pump room.
Nol-Turesh pipeline:
- - Rehabilitation engineering of the Salama pumping station:
- - Replacement engineering of 3 new pumps (180 m³/h at 373 m);
- - Replacement engineering of the electrical panels;
- - Rehabilitation engineering of the generator (1.825 kVA).