Kenya

Mavoko Drinking Water Supply Project

(2017-02-01 - 2020-08-31)

KMC Dam:

  •  - Design of 2 + 1 pumps of 115 m³/h at 115 m, electrical panels, piping and valves
  •  - Engineering of the pump room
  •  - Design of a 6.2 km HDPE OD 355 raw water main from the intake towards the new water treatment plant
  •  - Design of a step-down transformer (11/0.40 kV, 315 kVA)
  •  - Rehabilitation engineering and cleaning of the existing dam.

 

EAPCC Dam:

  •  - Design of 1 + 1 pumps of 115 m³/h at 115 m, electrical panels, piping and valves
  •  - Rehabilitation engineering of the pump room;
  •  - Design of a 3.6 km of HDPE OD 250 raw water main for the raw water backup towards the new water treatment plant
  •  - Design of a new step-down transformer (11/0.40 kV, 200 kVA)
  •  - Rehabilitation engineering and cleaning of the existing dam.
  •  - Design of a step-down transformer (11/0.40 kV, 315 kVA).

 

New water treatment plant:

  •  - Engineering of a 12,000 m³/day drinking water treatment plant.
  •  - Engineering of a 5,000 m³ reinforced concrete ground reservoir incl. procurement and installation of valves and ancillary equipment.

 

Nairobi - Syokimau pipeline:

  • - Design of a 10,6 km HDPE OD 400 from Nairobi to Syokimau to improve the drinking water supply coming from the capital;
  •  - Engineering of a 4,000 m³ storage reservoir downstream this new pipeline;
  •  - Engineering of a 300 m³ steel elevated tank to enable the supply of drinking water in the elevated zone of Syokimau;
  •  - Design of 1 + 1 pumps (200 m³/h at 25 m), electrical panels, piping, and valves;
  •  - Engineering a small pump room.

 

Nol-Turesh pipeline:

  •  - Rehabilitation engineering of the Salama pumping station:
  •  - Replacement engineering of 3 new pumps (180 m³/h at 373 m);
  •  - Replacement engineering of the electrical panels;
  •  - Rehabilitation engineering of the generator (1.825 kVA).